RETROFIT OF EUROPE’S LARGEST
CONTINUOUS HEAT TREATMENT PLANT


With a length of over 40 meters, the four-storey continuous heat treatment plant belonging to our client from the automobile sector is the largest plant for structural and chassis components in Europe. Antrok was significantly involved in the construction and installation of the plant. The plant underwent a retrofit in 2018.

With the aim of reducing the susceptibility to failures, the manipulators were tested and the chains, drive wheels, drive rollers and defective parts were exchanged. To improve stability, during the process the furnace rails of the carts were replaced by an improved and fixed version, which will reliably prevent slippage in the future.

Following this, the sliding contacts for the power rail of the water bath and the air shower were checked and services alongside the repair work on the control cabinet for the water bath following damage. In future, additional safety will be provided by the integration of a safety temperature circuit for the gas stoves, which will automatically switch the system to fault if the temperature is exceeded.

Your contact


Are you looking for a reliable partner for a similar project?
Talk to us.

Stefan Bischof
Division manager automation

Mobile:: +49 152 56447550

stefan.bischof@antrok.dePfeil nach Rechts

ConsentThis website uses Google Analytics and YouTube videos.
Your consent to their use is voluntary and may be revoked at any time.
A simple revocation option and further information can be found in our privacy policy.
Decline Accept